Ogle County Highway Department

March 11, 2008 Bid Results


 

  2008 Spraying Guardrail and Roadside Spraying
  2008 Striping Centerline and Edgeline Striping
  08-XX000-00-GM Township Hot Mix Patching Materials
  08-00000-01-GM County Hot Mix Patching Materials
  07-00246-00-GR 2008 Guardrail Replacements
  07-00249-00-BR Lowden Road Bridge
  07-14132-00-BR Adeline Road Bridge

Bid results are typically posted by 1:00 P.M. on the day of the letting.
The bid results are preliminary until approved by the County Board.