March 5, 2021 Bid Letting

Click here for instructions on downloading plans and specifications and becoming authorized to bid.

Plans and specifications are typically available the third Thursday before the letting.
Click here for the “For Bid” plan holder list. It will be updated Tuesdays and Fridays prior to the letting.

THE MARCH BID OPENING WILL BE DONE REMOTELY, NOT IN PERSON.  PLEASE FOLLOW THE LINK BELOW FOR DETAILED INFORMATION REGARDING THE REMOTE BID OPENING HELD USING ZOOM:
ZOOM MEETING INSTRUCTIONS


Bid results are typically posted by 3:30 P.M. on the day of the letting.

The bid results are preliminary until approved by the County Board.

 Section No. Description
Pre-Bid
Forms
Plans
Proposal/
Specifications
Addenda
Bid Tabulation
 2021 Township Patching Material
 Sec 21-XX000-00-GM
Material
Supplier
Authorization
 N/A 21-XX000-00-GM Township Patching Quote    
 2021 County Patching Material 
 Sec 21-00000-01-GM
Material
Supplier
Authorization
 N/A  21-00000-01-GM County Patching Quote    
2021 County Striping
Sec 21-00000-06-GM
Contractor Supplier Authorization  N/A 21-000000-06-GM County Striping    
Flagg Road Culvert Structural Upgrade
Sec. 20-00335-00-BR
(MOVED TO APRIL LETTING)
N/A N/A N/A    
 Meridian Road Culvert  Extensions
 Sec 20-00336-00-BR
Contractor Supplier Authorization 20-00336-00-BR
Project Plans
20-00336-00-BR Meridian Road    
 Kennedy Hill Road Gutter   Improvements
 Sec 21-00338-00-CG
Contractor Supplier Authorization  21-00338-00-CG
Project Plans
21-00338-00-CG
Kennedy Hill Road
   
 Maple Grove Road Culvert Replacement
 Sec 19-16120-00-BR
(MOVED TO APRIL LETTING)
N/A N/A N/A    
 Highway Department Salt Shed Paving Contractor Supplier Authorization          Project Plans Highway Department Salt Shed Paving    
Back
to top